Deliverable Megawatt Calculator

Work out how many megawatts a site can actually energize, when, and how much of that load a clean energy strategy can cover.

Power Deliverability Score

71 / 100

Deliverable with conditions

Grid Capacity

Substation headroom against the load you want

93

weight 35%

50 MW
1.30
220 MW
120 MW
83 / 100

Queue and Timeline

When the megawatts actually arrive

71

weight 25%

24 months
70 / 100
12 months
71 / 100
15 MW

Energy Strategy

Renewable access and on site generation

33

weight 20%

35 %
35 / 100
55 / 100
0 MW
0 / 100

Utility Reliability

Outage history and network resilience

70

weight 20%

240 min
76 / 100
3.00
74 / 100
60 / 100

How the score is built

Each input is converted to a score out of 100, averaged inside its group by field weight, then averaged across groups by the group weights below. Inputs without a weight feed the calculated outputs only.

  • Grid Capacity35%
  • Queue and Timeline25%
  • Energy Strategy20%
  • Utility Reliability20%

Reading the result

  • 80+Power secured

    Capacity, timeline and reliability all support the target load.

  • 65+Deliverable with conditions

    Achievable, but phasing and upgrade works need to be locked down.

  • 45+Constrained

    The site will carry meaningfully less than the target load or arrive late.

  • 0+Power blocked

    There is not a credible path to the megawatts on these inputs.

The working canvas

The calculator is the quantitative half. This is the page your team fills in around it, block by block, in a workshop or a diligence session.

DataRest Cloud logo

DataRest Cloud

Power Assessment Canvas

Grid Capacity

Substation headroom

Interconnection Queue

Position & timeline

Renewable Access

PPAs, onsite, 24/7 CFE

Utility Reliability

SAIDI/SAIFI, N+1

Expansion Path

Phase 2+ energization

Deliverable MW Timeline

MW by phase & date